boundary wall repair
hyderabad, telangana
- construction of gpra at amaravati, the new capital city of andhra pradesh. sh: planning, designing and construction of 1504 residential quarters comprising 600 type-ii quarters in 3 towers ( g plus 24 each), 600 type-iii quarters in 3 towers ( g plus 24 each), 228 type-iv quarters in 3 tower ( g plus 18 each), 56 type-v quarters in 1 tower ( g plus 13) and 20 type-vi quarters in 1 tower ( g plus 9), with a common double basement, ancillary building ( g plus 4), boundary wall, entrance gate compl
- Authority : Central Public Works Department
- Deadline : 07 Oct 2026
- Value : 1083.41 Crores
- Download
dahanu, maharashtra
- provision of infrastructure development works (earthwork in embankment, bridge extension, retaining wall cum boundary wall, road works, etc.) in connection with development of land for proposed poh cum new emu maintenance depot at vangaon
- Authority : Ministry Of Railways
- Deadline : 21 Sep 2026
- Value : 371.49 Crores
- Download
nadaun, himachal pradesh
- part i civil work construction of building portion i/c w.s. and s.i. rain water harvesting tank, septic tank, site development, fire fighting, water storage tank, approach road boundary wall etc.) part-ii-electric work (sh- sitc, electrical installation,
- Authority : Public Works Department
- Deadline : 19 Sep 2026
- Value : 62.69 Crores
- Download
lucknow, uttar pradesh
- construction of infrastructure for 22nd bn. hqrs ssb having (i) office building (ii) admin block/training block including iei and fans, substation, fire detection and alarm system, dg sets and (iii) boundary wall etc. at maharajganj under frontier lucknow u.p.
- Authority : Central Public Works Department
- Deadline : 15 Sep 2026
- Value : 21.23 Crores
- Download
bhiwani, haryana
- construction of 21.00 mld mps with peak factor 2.25 and renovation of existing mps, ips including pump chamber, boundary wall, staff quarter, installation of pumping machinery, rising main line, d.g set and electric transformers. laying the sewer lines in
- Authority : Public Health Engineering Department
- Deadline : 14 Sep 2026
- Value : 20.44 Crores
- Download
anakapalle, andhra pradesh
- construction of balance boundary wall for barc colony at ravipalem and miscellaneous survey works at barc, atchutapuram near visakhapatnam. a.p
- Authority : Bhabha Atomic Research Centre
- Deadline : 17 Sep 2026
- Value : 10.85 Crores
- Download
bordumsa circle, arunachal pradesh
- construction of ors living accommodation, kitchen and dining hall and const boundary wall, main gate, guard room, sentry post at tadadege bop of 57 bn itb police
- Authority : Indo Tibetan Border Police Force
- Deadline : 19 Sep 2026
- Value : 8.96 Crore
- Download
bangalore, karnataka
- construction of check post at entrance of the airport depot approach road and construction of boundary wall for bmrcl acquired land surrounded by private properties in airport line, bangalore metro rail project- package-3/phase-2 b.
- Authority : Bangalore Metro Rail Corporation Limited
- Deadline : 06 Oct 2026
- Value : 8.08 Crore
- Download
guwahati, assam
- construction of office cum residential complex along with boundary wall at fcp saralpara under sib guwahati
- Authority : Central Public Works Department
- Deadline : 25 Sep 2026
- Value : 7.93 Crore
- Download
lucknow, uttar pradesh
- construction work for repair and renovation of boundary wall and building at premises of civil defence training institute lucknow
- Authority : Uttar Pradesh Rajya Nirman Sahkari Sangh Limited
- Deadline : 15 Sep 2026
- Value : 7.37 Crore
- Download
nadaun, himachal pradesh
- civil work (sh construction of building portion i/c ws si, septic tank soak pit, rail water harvesting tank, site development, boundary wall etc.) part-ii (electrical work) (sh providing e.i., fire fighting system, fire alarm system, dg set, cctv surveill
- Authority : Public Works Department
- Deadline : 14 Sep 2026
- Value : 7.03 Crore
- Download
bareilly, uttar pradesh
- greater bareilly awasiy yojana ke sector-04 ke commercial block mein antarik vikas karya ke antargat sewer line, water line, rcc drain, electric trench, park boundary wall tatha sadak ka nirman karya
- Authority : Bareilly Development Authority
- Deadline : 24 Sep 2026
- Value : 6.83 Crore
- Download
nadaun, himachal pradesh
- construction of 100 bedded girls community centre at nadaun district hamirpur. (sh: construction of building portion i/c ws & si, septic tank and soak pit, rain water harvesting tank, site development, boundary wall etc & providing e.i, fire fighting syst
- Authority : Public Works Department
- Deadline : 14 Sep 2026
- Value : 6.64 Crore
- Download
mumbai, maharashtra
- raze and rebuild of the entire boundary wall of sewree i terminal
- Authority : Indian Oil Corporation Limited
- Deadline : 22 Sep 2026
- Value : 6.47 Crore
- Download
guwahati, assam
- additional estimate for construciton of judicial court building with garrage (2 nos.), sentry post (2 nos.), internal boundary wall and c.c. pavement in the judicial court complex at amingaon, guwahati. (furniture and electrical works)
- Authority : Public Works Department
- Deadline : 14 Sep 2026
- Value : 6.26 Crore
- Download
sahpur, himachal pradesh
- development and providing bulk services. sh construction of of boundary wall along with watch tower, guard room and security light at bsf campus kangra of 185 bn bsf under shq bsf gurdaspur
- Authority : Border Security Force
- Deadline : 15 Sep 2026
- Value : 6.02 Crore
- Download
bhubaneswar, orissa
- construction of truck terminal (boundary wall and land development) at kalinga, kandhamal.
- Authority : Orissa State Police Housing And Welfare Corporation Limited
- Deadline : 19 Sep 2026
- Value : 5.60 Crore
- Download
dhakuakhana, assam
- construction of muga spun silk mill along with boundary wall, under ground reservoir, elevated surface water reservoir, effluent treatment plant, rapid sand filter etc. at gogamukh sericulture farm, dhemaji
- Authority : Department Of Textile
- Deadline : 18 Sep 2026
- Value : 5.41 Crore
- Download
agartala, tripura
- construction of open gallery, boundary wall, field development works, internal water supply, sanitary installation etc during the year 2025-26.
- Authority : Public Works Department
- Deadline : 25 Sep 2026
- Value : 5.33 Crore
- Download
hamirpur, himachal pradesh
- special repair of nh 503 a punjab border bankhandi una lathaiani salouni bhota at various locations from km 000 to 70000 sh construction of retaining wall breast wall wing wall rcc box culverts rcc cantilever walls covered u shape drain and patch work
- Authority : Ministry Of Road Transport And Highways
- Deadline : 28 Sep 2026
- Value : 5.11 Crore
- Download
government tender from :
