boundary wall repair
hyderabad, telangana
- construction of gpra at amaravati, the new capital city of andhra pradesh. sh: planning, designing and construction of 1504 residential quarters comprising 600 type-ii quarters in 3 towers ( g plus 24 each), 600 type-iii quarters in 3 towers ( g plus 24 each), 228 type-iv quarters in 3 tower ( g plus 18 each), 56 type-v quarters in 1 tower ( g plus 13) and 20 type-vi quarters in 1 tower ( g plus 9), with a common double basement, ancillary building ( g plus 4), boundary wall, entrance gate compl
- Authority : Central Public Works Department
- Deadline : 07 Oct 2026
- Value : 1083.41 Crores
- Download
dahanu, maharashtra
- provision of infrastructure development works (earthwork in embankment, bridge extension, retaining wall cum boundary wall, road works, etc.) in connection with development of land for proposed poh cum new emu maintenance depot at vangaon
- Authority : Ministry Of Railways
- Deadline : 21 Sep 2026
- Value : 371.49 Crores
- Download
gurugram, haryana
- construction of special operation training centre at nsg campus manesar gurugram haryana sh construction of administrative block g plus 1 tower block g plus 6 50m modular shooting range shoot house g plus 1 270 degree live firing simlulator boundary walls with entry gates guard rooms etc including all civil and e and m works external development work on epc mode-ii basis
- Authority : Central Public Works Department
- Deadline : 16 Oct 2026
- Value : 122.76 Crores
- Download
nadaun, himachal pradesh
- part i civil work construction of building portion i/c w.s. and s.i. rain water harvesting tank, septic tank, site development, fire fighting, water storage tank, approach road boundary wall etc.) part-ii-electric work (sh- sitc, electrical installation,
- Authority : Public Works Department
- Deadline : 19 Sep 2026
- Value : 62.69 Crores
- Download
bhiwani, haryana
- augmentation of w s scheme bhiwani town construction of water works structures and boosting stations at various location including rcc ss tanks boundary wall clear water tanks pump chambers r w suction well rising main lines electric etc
- Authority : Public Health Engineering Department
- Deadline : 06 Oct 2026
- Value : 56.61 Crores
- Download
delhi
- construction of boundary wall and beautification of dry munak canal from downstream of outer ring road to inderlok metro station for the year 2025-26
- Authority : Irrigation And Flood Control Department
- Deadline : 25 Sep 2026
- Value : 42.03 Crores
- Download
delhi
- -construction of retaining wall/boundary wall between rd 16436m to rd 17700m on left bank, rd 18300m to rd 18720m on right bank, rd 18720m to rd 18750m on right bank, rd 18750m to rd 18350m on left bank, rd 19804m to rd 19554m on left bank, rd 19360m to rd 20700m on right bank and rd 22086m to rd 21740m on right bank of supplementary drain for the year 2025-26 h.o.a. remodelling of drain
- Authority : Irrigation And Flood Control Department
- Deadline : 29 Sep 2026
- Value : 30.25 Crores
- Download
bareilly, uttar pradesh
- construction of sewer lines, water lines, rcc drains, electrical trenches, parks, boundary walls, and roads as part of internal development works in sector-07 of the greater bareilly residential scheme.
- Authority : Bareilly Development Authority
- Deadline : 08 Oct 2026
- Value : 23.05 Crores
- Download
panipat, haryana
- construction of boundary wall at panipat refinery and petrochemical complex panipat haryana.
- Authority : Indian Oil Corporation Limited
- Deadline : 07 Oct 2026
- Value : 21.88 Crores
- Download
haveli, maharashtra
- construction of boundary wall at various locations including demolition of existing wall under ge (p) nda.
- Authority : Military Engineering Services
- Deadline : 13 Oct 2026
- Value : 20.00 Crores
- Download
taliparamba, kerala
- addn/ altn and special repairs to security wall at ina ezhimala
- Authority : Military Engineering Services
- Deadline : 15 Oct 2026
- Value : 18.10 Crores
- Download
bareilly, uttar pradesh
- construction of kendriya vidyalaya 09 no. residential qtrs. (type-ii-4 nos., type-iii-4 nos. type-v-1 no.) i/c provision of boundary wall, volleyball court, basket ball court and water supply electrical installation at ssb campus 39th bn. gadnia, palia (up). (balance work).
- Authority : Central Public Works Department
- Deadline : 03 Oct 2026
- Value : 14.21 Crores
- Download
anakapalle, andhra pradesh
- construction of balance boundary wall for barc colony at ravipalem and miscellaneous survey works at barc, atchutapuram near visakhapatnam. a.p
- Authority : Bhabha Atomic Research Centre
- Deadline : 17 Sep 2026
- Value : 10.85 Crores
- Download
bareilly, uttar pradesh
- construction of sewer lines, water lines, rcc drains, electric trenches, parks, boundary walls, and roads as part of internal development works in sector-11 of the greater bareilly residential scheme.
- Authority : Bareilly Development Authority
- Deadline : 08 Oct 2026
- Value : 9.72 Crore
- Download
guwahati, assam
- construction of office cum residential complex along with boundary wall for sib at mathanguri (assam)
- Authority : Central Public Works Department
- Deadline : 29 Sep 2026
- Value : 9.01 Crore
- Download
bordumsa circle, arunachal pradesh
- construction of ors living accommodation, kitchen and dining hall and const boundary wall, main gate, guard room, sentry post at tadadege bop of 57 bn itb police
- Authority : Indo Tibetan Border Police Force
- Deadline : 19 Sep 2026
- Value : 8.96 Crore
- Download
guwahati, assam
- construction of office cum residential complex along with boundary wall for sib at hojai, assam
- Authority : Central Public Works Department
- Deadline : 29 Sep 2026
- Value : 8.95 Crore
- Download
bangalore, karnataka
- construction of check post at entrance of the airport depot approach road and construction of boundary wall for bmrcl acquired land surrounded by private properties in airport line, bangalore metro rail project- package-3/phase-2 b.
- Authority : Bangalore Metro Rail Corporation Limited
- Deadline : 06 Oct 2026
- Value : 8.08 Crore
- Download
guwahati, assam
- construction of office cum residential complex along with boundary wall at fcp saralpara under sib guwahati
- Authority : Central Public Works Department
- Deadline : 25 Sep 2026
- Value : 7.93 Crore
- Download
akoda, haryana
- replacement of pumping machinery and installation of additional dg set and transformer, replacement of pumping machinery and installation of additional genset and transformer, di rising main, pumping machinery, boundary wall (40 metre), cement concrete
- Authority : Public Health Engineering Department
- Deadline : 22 Sep 2026
- Value : 7.66 Crore
- Download
government tender from :
