Short Tenders Information
supply of liquid and brush-able staro polyurea (hybrid polyurea) coating of two pack system. i) curing time of product shall be maximum 24 hrs after application. ii) the coating shall have heat resistance for the temperature of minimum 130 deg | |
Tenders Location | maharashtra - thane |
Tenders Value | Refer Document |
Tender categeory | miscellaneous |
Deadline | 03 apr 2024 |
Our Ref. ID | 240328419320 |
Download Tender Document |